The project had the objective of permanently closing all the three Landfill sites in Malta and restoring the sites to be used as public parks.
The rehabilitation of the landfill sites were aimed at bringing about the following socio-economic objectives: reduction in visual disamenity associated with the three sites; improvement in the control of aerial emissions of landfill gases (methane) and combustion gases by the existing ERDF-funded aerial emissions control system at Magħtab and Qortin; and a reduction in the leachate volume produced, and consequent impacts on nearby groundwater quality at Magħtab (and to a lesser extent at Qortin).
Project cost: €15,619,815
Beneficiary: WasteServ Malta Limited
Ministry: Ministry for Sustainable Development, the Environment and Climate Change
Start Date: 2010
End Date: 2015
Operational Programme: Investing in Competitiveness for a Better Quality of Life
Fund: Cohesion Fund