Project cost: €24,896
Beneficiary: Gozo College Secondary School
Ministry: Ministry for Education, Sports, Youths, Research and Innovation (MEYR)
Start Date: 2019
End Date: 2022
Fund: Erasmus+
Priority Axis: This project had a horizontal priority i.e. supporting individuals in acquiring and developing basic skills and key competences. It is also in the School Education priority - Strengthening the profiles of the teaching professions.
Focus area of intervention: ICT new technologies (digital technology), health and well being, key competences (maths and literacy basic skills)
Project cost: €941,176
Beneficiary: Foundation for Social Welfare Services (FSWS)
Ministry: Ministry for Social Policy and Children’s Rights (MSPC)
Start Date: 2018
End Date: 2022
Operational Programme: MT03 – Local Development and Poverty Reduction
Fund: EEA and Norway Financial Mechanisms 2014-2021
Priority Axis: PS6 – Social Inclusion, Youth Employment and Poverty Reduction
Focus area of intervention: PA8 – Children and Youth at Risk
Project cost: €210,000
Beneficiary: Local Government Division
Ministry: Ministry for the National Heritage, the Arts and Local Government (MHAL)
Start Date: 2018
End Date: 2022
Operational Programme: MT03 – Local Development and Poverty Reduction
Fund: EEA and Norway Financial Mechanisms 2014-2021
Priority Axis: PS4 – Culture, Civil Society, Good Governance and Fundamental Rights and Freedoms
Focus area of intervention: PA16 – Good Governance, Accountable Institutions, Transparency
Project cost: €69,700.00
Beneficiary: Paola Local Council
Ministry: Ministry for the National Heritage, the Arts and Local Government
Start Date: 2022
End Date: 2023
Operational Programme: MT03 – Local Development and Poverty Reduction
Fund: EEA and Norway Financial Mechanisms 2014-2021
Priority Axis: PS2 – Small Grant Scheme (SGS) / SGSO
Focus area of intervention: PA10 – Local Development and Poverty Reduction
Project cost: €58,994.78
Beneficiary: Tarxien Local Council
Ministry: Ministry for the National Heritage, the Arts and Local Government (MHAL)
Start Date: 2021
End Date: 2022
Operational Programme: MT03 – Local Development and Poverty Reduction
Fund: EEA and Norway Financial Mechanisms 2014-2021
Priority Axis: PS2 – Small Grant Scheme (SGS) / SGSO
Focus area of intervention: PA10 – Local Development and Poverty Reduction
Project cost: €14,378.84
Beneficiary: Heritage Malta
Ministry: Ministry for the National Heritage, the Arts and Local Government (MHAL)
Start Date: 2022
End Date: 2023
Operational Programme: MT03 – Local Development and Poverty Reduction
Fund: EEA and Norway Financial Mechanisms 2014-2021
Priority Axis: 1
Focus area of intervention: PA14 – Cultural Entrepreneurship, Cultural Heritage and Cultural Cooperation
Project cost: €7,601,775.17
Beneficiary: Transport Malta
Ministry: Ministry for Transport, Infrastracture and Capital Projects (MTIP)
Start Date: 2018
End Date: 2023
Fund: European Maritime and Fisheries Fund
Priority Axis: 1
Project cost: €359,416.19
Beneficiary: AquaBioTech Ltd.
Start Date: 2018
End Date: 2022
Fund: European Maritime and Fisheries Fund
Priority Axis: 2
Project cost: €1,784,477.00
Beneficiary: Environment and Resources Authority
Ministry: Ministry for the Environment, Energy and Enterprise (MEEE)
Start Date: 2017
End Date: 2022
Fund: European Maritime and Fisheries Fund
Priority Axis: 6
Project cost: €446,896.08
Beneficiary: Department of Fisheries and Aquaculture
Ministry: Ministry for Agriculture, Fisheries and Animal Rights (MAFA)
Start Date: 2017
End Date: 2021
Fund: European Maritime and Fisheries Fund
Priority Axis: 1
Project cost: €248,501.00
Beneficiary: Department of Fisheries and Aquaculture
Ministry: Ministry for Agriculture, Fisheries and Animal Rights (MAFA)
Start Date: 2017
End Date: 2018
Fund: European Maritime and Fisheries Fund
Priority Axis: 5
Project cost: €539, 842.46
Beneficiary: Malta Police Force (MPF)
Ministry: Ministry for Home Affairs, Security, Reforms and Equality (MHSR)
Start Date: 2016
End Date: 2021
Fund: Internal Security Fund
Project cost: €55,685.96
Beneficiary: Cross Culture International Foundation
Start Date: 2017
End Date: 2019
Fund: Asylum, Migration and Integration Fund
Project cost: €3,735,195.06
Beneficiary: Ministry for Education, Sports, Youths, Research and Innovation (MEYR)
Ministry: Ministry for Education, Sports, Youths, Research and Innovation (MEYR)
Start Date: 2017
End Date: 2023
Fund: Asylum, Migration and Integration Fund
Project cost: €56,295.20
Beneficiary: Victim Support Malta
Ministry: Ministry for Inclusion, Voluntary Organisation and Consumer Rights
Start Date: 2021
End Date: 2023
Operational Programme: OPII Investing in human capital to create more opportunities and promote the well being of society
Fund: European Social Fund
Priority Axis: 2
Focus area of intervention: Mental Health and Suicide Awareness
Project cost: €29, 678.00
Beneficiary: Prisms
Ministry: Ministry for Inclusion, Voluntary Organisation and Consumer Rights
Start Date: 2021
End Date: 2023
Operational Programme: OPII Investing in human capital to create more opportunities and promote the well being of society
Fund: European Social Fund
Priority Axis: 2
Focus area of intervention: Supporting vulnerable youths coming from institutions
Project cost: €68,400.00
Beneficiary: Fondazzjoni għall-Opri Socjali fl-Arcidjocesi ta’ Malta
Ministry: Ministry for Inclusion, Voluntary Organisation and Consumer Rights
Start Date: 2021
End Date: 2023
Operational Programme: OPII Investing in human capital to create more opportunities and promote the well being of society
Fund: European Social Fund
Priority Axis: 2
Focus area of intervention: Supporting the young generations in Senglea through specialized support to address any personal difficulties related to education and employment
Project cost: €200,000.00
Beneficiary: Richmond Foundation
Ministry: Ministry for Inclusion, Voluntary Organisation and Consumer Rights
Start Date: 2021
End Date: 2023
Operational Programme: OPII Investing in human capital to create more opportunities and promote the well being of society
Fund: European Social Fund
Priority Axis: 2
Focus area of intervention: Mental Health and Inclusion
Project cost: €9,372,051.00
Beneficiary: Malta College of Arts, Science and Technology
Ministry: Ministry for Education, Sports, Youth, Research and Innovation
Start Date: 2017
End Date: 2023
Operational Programme: OPII Investing in human capital to create more opportunities and promote the well being of society
Fund: European Social Fund
Priority Axis: 2
Focus area of intervention: Educational interventions for vulnerable students
Project cost: €3,155,769.00
Beneficiary: Ministry for Health
Ministry: Ministry for Health
Start Date: 2017
End Date: 2023
Operational Programme: OPII Investing in human capital to create more opportunities and promote the well being of society
Fund: European Social Fund
Priority Axis: 2
Focus area of intervention: Enhancing the health and care service delivery through training for the health and care professionals/workers
Project cost: €350,645.00
Beneficiary: Richmond Foundation
Ministry: Ministry for Inclusion, Voluntary Organisation and Consumer Rights
Start Date: 2017
End Date: 2023
Operational Programme: OPII Investing in human capital to create more opportunities and promote the well being of society
Fund: European Social Fund
Priority Axis: 2
Focus area of intervention: Mental Health and Inclusion.
Project cost: €4,200,000.00
Beneficiary: The Anglican Church in Malta & Gozo
Ministry: Ministry for Inclusion, Voluntary Organisations and Consumer Rights
Start Date: 2018
End Date: 2023
Operational Programme: OPI Fostering a competitive and sustainable economy to meet our challenges
Fund: European Regional Development Fund
Priority Axis: 5
Focus area of intervention: Protection, development and promotion of public cultural and heritage assets.
Project cost: €1,900,000.00
Beneficiary: Porto Salvo and St Dominic Foundation
Ministry: Ministry for Inclusion, Voluntary Organisations and Consumer Rights
Start Date: 2018
End Date: 2023
Operational Programme: OPI Fostering a competitive and sustainable economy to meet our challenges
Fund: European Regional Development Fund
Priority Axis: 5
Focus area of intervention: Protection, development and promotion of public cultural and heritage assets.
Project cost: €355,371.47
Beneficiary: Munxar Local Council
Ministry: Ministry for the National Heritage, the Arts and Local Government
Start Date: 2017
End Date: 2023
Operational Programme: OPI Fostering a competitive and sustainable economy to meet our challenges
Fund: European Regional Development Fund
Priority Axis: 5
Focus area of intervention: Protection and enhancement of biodiversity, nature protection and green infrastructure; Protection, development and promotion of public cultural and heritage assets.
Project cost: €678,550.74
Beneficiary: Naxxar Local Council
Ministry: Ministry for the National Heritage, the Arts and Local Government
Start Date: 2017
End Date: 2023
Operational Programme: OPI Fostering a competitive and sustainable economy to meet our challenges
Fund: European Regional Development Fund
Priority Axis: 5
Focus area of intervention: Protection, development and promotion of public cultural and heritage assets.
Project cost: €1,716,884.82
Beneficiary: Gozo Diocese through its specifically set up KURA Association
Ministry: Ministry for Gozo
Start Date: 2018
End Date: 2023
Operational Programme: OPI Fostering a competitive and sustainable economy to meet our challenges
Fund: European Regional Development Fund
Priority Axis: 5
Focus area of intervention: Protection, development and promotion of public cultural and heritage assets.
Project cost: €1,521,665.76
Beneficiary: Ministry for the National Heritage, the Arts and Local Government
Ministry: Ministry for the National Heritage, the Arts and Local Government
Start Date: 2016
End Date: 2019
Operational Programme: OPI Fostering a competitive and sustainable economy to meet our challenges
Fund: European Regional Development Fund
Priority Axis: 5
Focus area of intervention: Protection, development and promotion of public cultural and heritage assets.
Project cost: €18,000,000
Beneficiary: Heritage Malta
Ministry: Ministry for the National Heritage, the Arts and Local Government
Start Date: 2016
End Date: 2023
Operational Programme: OPI Fostering a competitive and sustainable economy to meet our challenges
Fund: European Regional Development Fund
Priority Axis: 5
Focus area of intervention: Protection, development and promotion of public tourism assets; Protection, development and promotion of public cultural and heritage assets.
Project cost: €30,000,000.00
Beneficiary: The University of Malta
Ministry: Ministry for Education, Sport, Youth, Research and Innovation
Start Date: 2017
End Date: 2023
Operational Programme: OPI Fostering a competitive and sustainable economy to meet our challenges
Fund: European Regional Development Fund
Priority Axis: 1
Focus area of intervention: Research and innovation infrastructure (public)
Project cost: €13,356,881.37
Beneficiary: WasteServ Malta
Ministry: Ministry for the Environment, Energy and Enterprise
Start Date: 2017
End Date: 2023
Operational Programme: OPI Fostering a competitive and sustainable economy to meet our challenges
Fund: Cohesion Fund
Priority Axis: 10
Focus area of intervention: Household waste management (including mechanical biological treatment, thermal treatment, incineration and landfill measures)
Project cost: €12,167,295
Beneficiary: Ministry for Gozo
Ministry: Ministry for Gozo
Start Date: 2012
End Date: 2015
Operational Programme: Investing in Competitiveness for a Better Quality of Life
Fund: European Regional Development Fund
Focus area of intervention: Product development
Project cost: €31,066,375
Beneficiary: The University of Malta
Ministry: Ministry for Education, Sport, Youth, Research and Innovation
Start Date: 2017
End Date: 2023
Operational Programme: Fostering a competitive and sustainable economy to meet our challenges
Fund: European Regional Development Fund
Focus area of intervention: Research and innovation infrastructure (public)
Project cost: €7,060,900.28
Beneficiary: Planning Authority
Ministry: Ministry for Public Works and Planning
Start Date: 2017
End Date: 2022
Operational Programme: Fostering a competitive and sustainable economy to meet our challenges
Fund: European Regional Development Fund
Focus area of intervention: Focus area of intervention: ICT: Other types of ICT infrastructure large-scale computer resources/equipment (including e-infrastructure, data centres and sensors; also where embedded in other infrastructure such as research facilities, environmental and social infrastructure).
Project cost: €9,147,873
Beneficiary: Heritage Malta
Ministry: Ministry for the National Heritage, the Arts and Local Government
Start Date: 2014
End Date: 2019
Operational Programme: Fostering a competitive and sustainable economy to meet our challenges
Fund: European Regional Development Fund
Focus area of intervention: Protection, development and promotion of public tourism assets; Protection, development and promotion of public cultural and heritage assets.
Project cost: €3,000,000
Beneficiary: Ministry for Education, Sport, Youth, Research and Innovation
Ministry: Ministry for Education, Sport, Youth, Research and Innovation
Start Date: 2014
End Date: 2023
Operational Programme: Fostering a competitive and sustainable economy to meet our challenges
Fund: European Regional Development Fund
Focus area of intervention: Education infrastructure for vocational education and training and adult learning
Project cost: €468,352
Beneficiary: Din l'Art Helwa
Ministry: Ministry for Tourism
Start Date: 2018
End Date: 2022
Operational Programme: Fostering a competitive and sustainable economy to meet our challenges
Fund: European Regional Development Fund
Focus area of intervention: Protection, development and promotion of public cultural and heritage assets.
Project cost: €3,560,316.43
Beneficiary: Fondazzjoni ghall-Patrimonju Kulturali ta' l-Arcidiocesi ta' Malta
Ministry: Ministry for Inclusion, Voluntary Organisations and Consumer Rights
Start Date: 2018
End Date: 2023
Operational Programme: Fostering a competitive and sustainable economy to meet our challenges
Fund: European Regional Development Fund
Priority Axis: 5
Focus area of intervention: Protection, development and promotion of public cultural and heritage assets.
Project cost: €14,000,000
Beneficiary: Armed Forces of Malta
Ministry: Ministry for Home Affairs, National Security and Law Enforcement
Start Date: 2015
End Date: 2017
Operational Programme: Internal Security Fund (Borders and Visas)
Fund: Internal Security Fund (Borders and Visas)
Project cost: €102,909
Start Date: 2019
End Date: 2022
Fund: Rural Development Programme
Project cost: €82,518
Start Date: 2018
End Date: 2019
Fund: Rural Development Programme
Project cost: €42,604
Start Date: 2019
End Date: 2022
Fund: Rural Development Programme
Project cost: €150,000
Start Date: 2020
End Date: 2022
Fund: Rural Development Programme
Project cost: €49,016
Start Date: 2018
End Date: 2019
Fund: Rural Development Programme
Beneficiary: €12,500
Start Date: 2022
End Date: 2023
Fund: Rural Development Programme
Project cost: €25,385
Start Date: 2018
End Date: 2019
Fund: Rural Development Programme
Project cost: €70,000
Start Date: 2019
End Date: 2022
Fund: Rural Development Programme
Project cost: €149,852
Start Date: 2018
End Date: 2020
Fund: Rural Development Programme
Project cost: €283,155
Start Date: 2019
End Date: 2021
Fund: Rural Development Programme
Project cost: €129,739
Start Date: 2018
End Date: 2021
Fund: Rural Development Programme
Project cost: €11,300,000
Beneficiary: Valletta Cultural Agency
Ministry: Ministry for Transport, Infrastructure and Capital Projects
Start Date: 2014
End Date: 2023
Operational Programme: Fostering a competitive and sustainable economy to meet our challenges
Fund: European Regional Development Fund
Project cost: €24,022,125
Beneficiary: Ministry for Transport, Infrastructure and Capital Projects
Ministry: Ministry for Transport, Infrastructure and Capital Projects
Start Date: 2015
End Date: 2023
Operational Programme: Fostering a competitive and sustainable economy to meet our challenges
Fund: European Regional Development Fund
Focus area of intervention: Focus area of intervention: Housing infrastructure; Development and promotion of tourism assets in SMEs; Development and promotion of cultural and creative services in or for SMEs; Protection, development and promotion of public cultural and heritage assets; Cross financing under the ERDF (support to ESF type actions necessary for the satisfactory implementation of the ERDF part of the operation and directly linked to it).
Project cost: €13,551,034
Beneficiary: The Malta Council for Science and Technology (MCST)
Ministry: Ministry for Education and Employment
Start Date: 2013
End Date: 2015
Operational Programme: Investing in Competitiveness for a Better Quality of Life
Fund: European Regional Development Fund
Focus area of intervention: Investment in RTDI and RTDi-related Infrastructure and ICT
Project cost: €245,324
Beneficiary: Ministry for Gozo
Ministry: Ministry for Gozo
Start Date: 2016
End Date: 2021
Operational Programme: Fostering a competitive and sustainable economy to meet our challenges
Fund: European Regional Development Fund
Focus area of intervention: Protection, development and promotion of public cultural and heritage assets.
Project cost: €4,234,958.19
Beneficiary: Ministry for Tourism
Ministry: Ministry for Tourism
Start Date: 2016
End Date: 2023
Operational Programme: Fostering a competitive and sustainable economy to meet our challenges
Fund: European Regional Development Fund
Focus area of intervention: Protection, development and promotion of public cultural and heritage assets.
Project cost: €9,990,120.24
Beneficiary: Industrial Innovative Solutions - Malta
Ministry: Ministry for the Economy, European Funds and Lands
Start Date: 2016
End Date: 2020
Operational Programme: Fostering a competitive and sustainable economy to meet our challenges
Fund: European Regional Development Fund
Focus area of intervention: Business infrastructure for SMEs (including industrial parks and sites)
Project cost: €40,878,585
Beneficiary: Infrastructure Malta
Ministry: Ministry for Transport, Infrastructure and Capital Projects
Start Date: 2017
End Date: 2023
Operational Programme: Fostering a competitive and sustainable economy to meet our challenges
Fund: Cohesion Fund
Focus area of intervention: TEN-T reconstructed or improved road
Project cost: €1,092,885
Beneficiary: Planning Authority
Ministry: Ministry for the Environment, Climate Change and Planning
Start Date: 2018
End Date: 2021
Operational Programme: Investing in human capital to create more opportunities and promote the wellbeing of society
Fund: European Social Fund
Project cost: €11,197,378
Beneficiary: Directorate for Quality and Standards in Education
Ministry: Ministry for Education
Start Date: 2016
End Date: 2023
Operational Programme: Investing in human capital to create more opportunities and promote the wellbeing of society
Fund: European Social Fund
Project cost: €9,550,360
Beneficiary: Jobsplus
Ministry: Ministry for Finance and Employment
Start Date: 2016
End Date: 2023
Operational Programme: Investing in human capital to create more opportunities and promote the wellbeing of society
Fund: European Social Fund
Project cost: €20,658,766.7
Beneficiary: Transport Malta
Ministry: Ministry for Transport, Infrastructure and Capital Projects
Start Date: 2014
End Date: 2019
Operational Programme: Fostering a competitive and sustainable economy to meet our challenges
Fund: Cohesion Fund
Focus area of intervention: TEN-T reconstructed or improved road
Project cost: €7,654,237
Beneficiary: Projects Development and Coordination Unit
Ministry: Ministry for Transport and Infrastructure
Start Date: 2008
End Date: 2015
Operational Programme: Investing in Competitiveness for a Better Quality of Life
Fund: European Regional Development Fund
Focus area of intervention: Urban Regeneration
Project cost: €89,500,000
Beneficiary: Water Services Corporation
Ministry: Ministry for the Environment, Energy and Enterprise
Start Date: 2016
End Date: 2023
Operational Programme: Fostering a competitive and sustainable economy to meet our challenges
Fund: Cohesion Fund
Focus area of intervention: Provision of water for human consumption (extraction, treatment, storage and distribution infrastructure);Water management and drinking water conservation (including river basin management, water supply, specific climate change; Adaptation measures, district and consumer metering, charging systems and leak reduction); Waste Water Treatment
Project cost: €3,821,196
Beneficiary: WasteServ Malta
Ministry: Ministry for the Environment, Energy and Enterprise
Start Date: 2016
End Date: 2022
Operational Programme: Fostering a competitive and sustainable economy to meet our challenges
Fund: Cohesion Fund
Focus area of intervention: Household waste management (including mechanical biological treatment, thermal treatment, incineration and landfill measures)
Project cost: €4,204,320
Beneficiary: Ministry for Gozo
Ministry: Ministry for Gozo
Start Date: 2008
End Date: 2013
Operational Programme: nvesting in Competitiveness for a Better Quality of Life
Fund: European Regional Development Fund
Focus area of intervention: Internal Mobility
Project cost: €10,378,633
Beneficiary: Transport Malta
Ministry: Ministry for Transport and Infrastructure
Start Date: 2010
End Date: 2015
Operational Programme: Investing in Competitiveness for a Better Quality of Life
Fund: Cohesion Fund
Focus area of intervention: Maritime Transport Links
Project cost: €37,380,259
Beneficiary: Transport Malta
Ministry: Ministry for Transport, Infrastructure and Capital Projects
Start Date: 2013
End Date: 2015
Operational Programme: Investing in Competitiveness for a Better Quality of LifeÂ
Fund: Cohesion Fund
Focus area of intervention: Road Transport Links
Project cost: €49,600,769
Beneficiary: Transport Malta
Ministry: Ministry for Transport, Infrastructure and Capital Projects
Start Date: 2009
End Date: 2015
Operational Programme: Investing in Competitiveness for a Better Quality of Life
Fund: Cohesion Fund
Focus area of intervention: Road Transport Links
Project cost: €20,792,553
Beneficiary: Malta Enterprise
Ministry: Ministry for the Economy, Investment and Small Business
Start Date: 2008
End Date: 2015
Operational Programme: Investing in Competitiveness for a Better Quality of Life
Fund: European Regional Development Fund
Focus area of intervention: Enterprise Infrastructure
Project cost: €14,610,900
Beneficiary: University of Malta
Ministry: Ministry for Education and Employment
Start Date: 2009
End Date: 2014
Operational Programme: Investing in Competitiveness for a Better Quality of Life
Fund: European Regional Development Fund
Focus area of intervention: Investment in RTDI and RTDi-related Infrastructure and ICT
Project cost: €51,664,271
Beneficiary: Ministry for Transport, Infrastructure and Capital Projects
Ministry: Ministry for Transport, Infrastructure and Capital Projects
Start Date: 2013
End Date: 2015
Operational Programme: Investing in Competitiveness for a Better Quality of Life
Fund: Cohesion Fund
Focus area of intervention: Flood Relief
Project cost: €15,619,815
Beneficiary: WasteServ Malta Limited
Ministry: Ministry for Sustainable Development, the Environment and Climate Change
Start Date: 2010
End Date: 2015
Operational Programme: Investing in Competitiveness for a Better Quality of Life
Fund: Cohesion Fund
Project cost: € 67,966,869
Beneficiary: Water Services Corporation
Ministry: Ministry for Energy and Health
Start Date: 2009
End Date: 2012
Operational Programme: Investing in Competitiveness for a Better Quality of Life
Fund: Cohesion Fund
Focus area of intervention: Internal Mobility
Project cost: € 13,803,586
Beneficiary: Malta Tourism Authority
Ministry: Ministry for Tourism
Start Date: 2008
End Date: 2015
Operational Programme: Investing in Competitiveness for a Better Quality of Life
Fund: European Regional Development Fund
Focus area of intervention: Niche Market Development and Branding
Project cost: €852,662
Beneficiary: Fondazzjoni Belt Victoria
Start Date: 2009
End Date: 2013
Operational Programme: Investing in Competitiveness for a Better Quality of Life
Fund: European Regional Development Fund
Focus area of intervention: Niche Market Development and Branding
Project cost: €15,019,481
Beneficiary: Grand Harbour Regeneration Corporation
Ministry: Ministry for Transport and Infrastructure
Start Date: 2012
End Date: 2015
Operational Programme: Investing in Competitiveness for a Better Quality of Life
Fund: European Regional Development Fund
Focus area of intervention: Niche Market Development and Branding
Project cost: €11,173,291
Beneficiary: Heritage Malta
Ministry: Ministry for Justice, Culture and Local Government
Start Date: 2012
End Date: 2015
Operational Programme: Investing in Competitiveness for a Better Quality of Life
Fund: European Regional Development Fund
Focus area of intervention: Niche Market Development and Branding
Project cost: € 1,920,852
Beneficiary: Fondazzjoni Wirt Artna
Start Date: 2009
End Date: 2015
Operational Programme: Investing in Competitiveness for a Better Quality of Life
Fund: European Regional Development Fund
Focus area of intervention: Supporting the private sector
Project cost: €9,260,758
Beneficiary: Heritage Malta
Ministry: Ministry for Justice, Culture and Local Government
Start Date: 2008
End Date: 2015
Operational Programme: Investing in Competitiveness for a Better Quality of Life
Fund: European Regional Development Fund
Focus area of intervention: Niche Market Development and Branding
Project cost: €4,443,634
Beneficiary: Ministry for Gozo
Ministry: Ministry for Gozo
Start Date: 2009
End Date: 2015
Operational Programme: Investing in Competitiveness for a Better Quality of Life
Fund: European Regional Development Fund
Focus area of intervention: Niche Market Development and Branding
Project cost: €14,102,661
Beneficiary: Employment and Training Corporation
Ministry: Ministry for Education and Employment
Start Date: 2009
End Date: 2015
Operational Programme: Empowering People for More Jobs and a Better Quality of Life
Fund: European Social Fund
Focus area of intervention: Promoting an inclusive society
Project cost: €808,875
Beneficiary: Malta Film Commission
Ministry: Ministry for Home Affairs and National Security
Start Date: 2012
End Date: 2015
Operational Programme: Empowering People for More Jobs and a Better Quality of Life
Fund: European Social Fund
Focus area of intervention: Continuous training and education
Project cost: €3,068,802
Beneficiary: Active Labour Market Policy Counselling and Monitoring Committee
Ministry: Ministry for Education and Employment
Start Date: 2013
End Date: 2015
Operational Programme: Empowering People for More Jobs and a Better Quality of Life
Fund: European Social Fund
Focus area of intervention: Promoting an inclusive society
Project cost: €48,767,025
Beneficiary: Ministry for Energy and Health
Ministry: Ministry for Energy and Health
Start Date: 2012
End Date: 2015
Operational Programme: Investing in Competitiveness for a Better Quality of Life
Fund: European Regional Development Fund
Focus area of intervention: Education, Social and Health-related Infrastructure
Project cost: €73,102
Start Date: 2020
End Date: 2021
Fund: Rural Development Programme
Project cost: €2,222,483
Beneficiary: Ministry for the Family and Social Solidarity
Ministry: Ministry for the Family and Social Solidarity
Start Date: 2013
End Date: 2015
Operational Programme: Empowering People for More Jobs and a Better Quality of Life
Fund: European Social Fund
Focus area of intervention: Promoting an inclusive society
Project cost: €272,347
Beneficiary: Dar Guzeppa Debono
Start Date: 2011
End Date: 2015
Operational Programme: Empowering People for More Jobs and a Better Quality of Life
Fund: European Social Fund
Focus area of intervention: Promoting an inclusive society
Project cost: €377,810
Beneficiary: National Commission Persons With Disability
Ministry: Ministry for the Family and Social Solidarity
Start Date: 2011
End Date: 2015
Operational Programme: Empowering People for More Jobs and a Better Quality of Life
Fund: European Social Fund
Focus area of intervention: Innovative activities
Project cost: €1,254,245
Beneficiary: University of Malta
Ministry: Ministry for Education and Employment
Start Date: 2011
End Date: 2015
Operational Programme: Empowering People for More Jobs and a Better Quality of Life
Fund: European Social Fund
Focus area of intervention: Addressing skills mismatches
Project cost: €8,982,082
Beneficiary: Directorate for Lifelong Learning
Ministry: Ministry for Education and Employment
Start Date: 2008
End Date: 2015
Operational Programme: Empowering People for More Jobs and a Better Quality of Life
Fund: European Social Fund
Focus area of intervention: Investing in the Education System
Project cost: € 18,427,088
Beneficiary: Malta College of Arts, Science and Technology
Ministry: Ministry for Education and Employment
Start Date: 2010
End Date: 2015
Operational Programme: Investing in Competitiveness for a Better Quality of LifeÂ
Fund: European Regional Development Fund
Focus area of intervention: Education, Social and Health-related Infrastructure
Project cost: € 7,939,277
Beneficiary: University of Malta
Ministry: Ministry for Education and Employment
Start Date: 2008
End Date: 2013
Operational Programme: Investing in Competitiveness for a Better Quality of LifeÂ
Fund: European Regional Development Fund
Focus area of intervention: Education, Social and Health-related Infrastructure
Project cost: € 2,932,803
Beneficiary: Transport Malta
Ministry: Ministry for Transport, Infrastructure and Capital Projects
Start Date: 2016
End Date: 2021
Operational Programme: European Maritime and Fisheries Fund
Project cost: €1,961,561
Beneficiary: Ministry for Gozo
Ministry: Ministry for Gozo
Start Date: 2008
End Date: 2012
Operational Programme: Investing in Competitiveness for a Better Quality of Life
Fund: European Regional Development Fund
Focus area of intervention: Product Development
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Etiam luctus volutpat consectetur. Sed quis sem venenatis, pellentesque neque at, laoreet eros. Donec et ornare nisi, in faucibus lorem. Nulla euismod tellus nisi, dictum vulputate urna vehicula vel. Sed porta ligula a orci sodales luctus. Proin id lacus vel ante malesuada pharetra pellentesque ac magna. Quisque sodales imperdiet bibendum. Donec commodo turpis id ligula finibus commodo.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Etiam luctus volutpat consectetur. Sed quis sem venenatis, pellentesque neque at, laoreet eros. Donec et ornare nisi, in faucibus lorem. Nulla euismod tellus nisi, dictum vulputate urna vehicula vel. Sed porta ligula a orci sodales luctus. Proin id lacus vel ante malesuada pharetra pellentesque ac magna. Quisque sodales imperdiet bibendum. Donec commodo turpis id ligula finibus commodo.
Project cost: €12,167,295
Beneficiary: Ministry for Gozo
Ministry: Ministry for Gozo
Start Date: 2012
End Date: 2015
Operational Programme: Investing in Competitiveness for a Better Quality of Life
Fund: European Regional Development Fund
Priority Axis: 2
Focus area of intervention: Product development
The project envisaged the implementation of the key actions identified in the Cittadella Masterplan (a policy document for the protection and management of the site). It also included the creation of a Visitors’ Centre restoration of principal public buildings, rehabilitation of public spaces and related infrastructural works within the Cittadella precincts.
Lorem Ipsum is simply dummy text of the printing and typesetting industry.